seems like a lot of route flappage overnight My normally stable freenode connection dropped and I can't reach some parts of the net this morning from my home I was also streaming some tv overnight, and that stopped too Uhm... Guys I was about to order a new fan to my laptop from IBMs web shop. The fan itself cost 122 SEK (incl. VAT) "Oh! Cheap!" They added shipping (143 SEK) and taxes (53 SEK I think) The total cost for the fan would be over 265 SEK WTF!? :P are you getting it from mars? :) No From IBMs website :;P :P hi! i just got my FreeBSD VPS set up with arp. \o/ NTP doesn't work (for obvious reasons) but I don't know of a good solution. anyone have advice? what are the obvious reasons? virtual machines aren't good at keeping time because the cpu lurches forward a lot. openntp oh, I didn't know that that might explain a few things openntp works better on virtual machines? well I don't know.. it's just what I use that's a ringing endorsement :) does openntp have something like ntpdc? I usuallly run "ntpdc -c peers" to check the status of things. afternoon y0 I'm able to run dynamips with no issue on my VPS. Not a big lab, but decent. yay for installing 8.1 with zfs root on my VPS Yeah! I'm still on 8.0.. been up 199 days. I tried the zfs root thing, not worth the trouble :P really isn't that much trouble at all asdf anyone around yes go to sleep ballen. haha noo I need to build a small data center well retrofit current space just need to convince my bosses boss and his boss to give us money for it sounds like a fun project to me! then find space we can steal from another group, then make sure everyone is one board for doing it correctly oh now it's sounding like a lot of work. I think I'm going to run out of space within a year at our current rate of growth, one room is maxed, the second can take one more rack, three if we got a new AC oh its going to be an epic amount of work need at least two CRAC units, a flywheel, a generator replace windows ooh flywheel with cinderblock block in two of three doors get a badge reader installed on the 3rd door rip out the heating ducting good project to have on resume! oh ea yea we need to run a little more power to the room install an EPO a very early smoke detection system a dry fire system make it so the wet system stays dry till smoke is detected skip the raised floor we'll see, need to get at least 1/4 mil for budget pocket change actually it is for the most part yea I suspect when I actually start quoting work out its going to be a lot more so you think of all this in a dream? :) some asbestos removal on the heating thats going to be ripped out nah we've been planning it for a while getting a good plan in place to start proposing to the division mgmt I'm just worried about running out of space well not just space but cooling and power and then being stuck in a place where we can't expand any longer oh wtf, why can't Ruby 1.9 compile mhoran, have an experience with any special rack systems, like APC's system that have built in cooling any* Hm. I do not.